Configuration flag CFGAllowOpsVoyageRenumbering enables voyage rescheduling; you must also have the Edit Voyage Number module right.

Rather than using the Reschedule Voyage formyou can use a Cargo Matching program for drag-and-drop voyage rescheduling. To prevent a gap in voyage numbering, you can enable configuration flag CFGEnforceSequentialVoyageNumbering.

You can drag and drop any voyage with a status of Scheduled. When you drag a voyage, valid drop locations are highlighted. All scheduled voyages for a vessel must commence after any previously commenced voyages and before any estimated voyages.

About Voyage Rescheduling

In Cargo Matching, you can do any of the following:

Enabling Drag-and-Drop Voyage Rescheduling

  1. To enable voyage rescheduling in Cargo Matching, do one of the following:
    • Create a program.
    • Edit an existing program: Select the program from the Program List  and then click .
  2. On the New Program or Edit Program form, select Enable Voyage Rescheduling

Rescheduling One or More Voyages

To reschedule one or more voyages:

  1. Select the voyage or voyages:
    • To select a single voyage , click the voyage; it is highlighted .
    • To select a range of consecutive voyages, hold down Shift while you select.
  2. Drag the voyage or voyages over a different voyage.
    • For a scheduled voyage, the commencing position of that voyage is highlighted.  Drop the voyage; the dropped voyage takes that commencing position, and the original voyage is made consecutive to it.
    • For the first estimated voyage of a vessel, the commencing position of that voyage is highlighted.  Drop the voyage; the dropped voyage takes that commencing position, and the original voyage is made consecutive to it.
    • For a blank space:
      • If there is a preceding voyage, the completion position of that voyage is highlighted . Drop the voyage; the dropped voyage takes that commencing position, and the original voyage is made consecutive to it.
      • If there is no preceding voyage or voyage estimate , the earliest position in the date range is highlighted. Drop the voyage; the dropped voyage keeps the same commencing date. This is the only case in which a dropped voyage is made non-consecutive.

Swapping Voyages

To swap any two scheduled voyages:

...