Welcome to the Veson Nautical Knowledge Base. In the Help Center, you can view the same articles and contact support as needed.

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Current »

Error rendering macro 'excerpt-include' : No link could be created for 'help:IMOS Documentation'.

NoteConfiguration flag CFGEnablePortToPortOverrides must be enabled, and you must have the Port-to-Port Overrides Module Right selected under Ports and Areas in the Data Center.

Port-to-Port Overrides enables you to override the standard IMOS calculations of transit duration and fuel consumption between any pair of ports. If the two ports between which the override is in effect comprise only a portion of the itinerary, the override is used for the applicable portion of the itinerary and the standard calculations are used for the rest of the itinerary.

In the Data Center , under Ports and Areas, click Port-to-Port Overrides.

  1. To define a sea leg, enter a From Port and To Port.
  2. Specify the Vessel Type for which the override applies.
  3. Add one or more rows to define Duration (Hrs) and fuel consumption, by Effective Date and Condition (Laden or Ballast), to be used instead of the standard calculations.
  • No labels