Welcome to the Veson Nautical Knowledge Base. In the Help Center, you can view the same articles and contact support as needed.

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Setup

Configuration flag CFGEnableVesselVetting enables Vessel Vetting/Approvals.

To access the Vessel Vetting form, the following Module Rights must be selected under Chartering in Security:

  • Actions: Vessel Vetting
  • Setup: Vessel Vetting Setup

Workflow

Follow these steps:

  1. Complete the Vessel Vetting Setup form for all parties that require vessel vetting.
  2. On the Voyage Fixture, the Vetting/Approvals field at the top right displays the vetting status of the Fixture with the vessel. To open the Vessel Vetting form, click the field label link.

    The Fixture Performing Vessel is set as the first tab. Each vessel tab includes a line for each of the entities for which the vessel needs to be vetted:
    • Each Company specified on the Vessel Vetting Setup form, with rows highlighted in yellow
    • Each Port/Function, Cargo combination
    • Additional entries, with rows highlighted in green
  3. Do any of the following:
    • To add another vessel, click the + tab.
    • To add a line, either click the next empty line or right-click a line and then click Insert.
    • Select either the Approved or the Rejected check box. Your user name appears in the Recorded By field, and the GMT time of the approval appears in the Recorded On field. You can enter free-text Comments in each row.
    • To edit Vetting Remarks, click the Remarks tab. To access Vetting Remarks from the Voyage Fixture, click  and then click Vetting Remarks.

The Validation symbol on this form indicates the status of the Voyage Fixture; to see outstanding issues, click it. The symbol on the Voyage Fixture includes its vetting status.

  • The vetting status is Pending until all entities for the performing vessel are selected as Approved, and then it turns to Completed.
  • A Voyage Fixture cannot be scheduled until the vetting status is Completed.
  • For a voyage, a vetting status of Pending causes a validation error.

Effects of Later Voyage Fixture or Voyage Edits

If changes are made to the Voyage Fixture or voyage after this form is saved:

  • Changes in Cargoes are updated on this form.
  • For ports removed after the voyage is scheduled, the vetting history is preserved.
  • For ports removed from the Voyage Fixture itinerary before the voyage is scheduled, only those with the Approved or Rejected check box selected on this form are retained.
  • No labels