Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Insert excerpt
IMOS
IMOS
nopaneltrue

...

The Speed Comparison Analysis calculates how alternative ballast/laden speeds impact voyage results.

On a Voyage Estimate Column view or Details view menu, click Analysis and then click Speed Comparison Analysis.

...

After specifying Ballast and Laden speeds, the following values are calculated for each set of speeds: Profit, TCE, Daily Profit, Bunker Expenses, Waiting Days, and Voyage Days.

Excerpt
  • CO2 (MT): Calculates CO2 emitted. If a fuel's CO2 Factor is  1.0000 or emptythe CO2 (MT) column will not calculate and will appear light red.
    • CO2 emissions are calculated by multiplying bunkers consumed by their associated CO2 Factors for the designated voyage leg. If multiple grades of bunkers are consumed, your CO2 emissions will show the joint value of all CO2 emissions for the associated voyage leg.
  • For Type G (Gas Carrier) vessels, monthly TCE appears instead of daily TCE.
  • Daily Cost: Defaults to the value of Dly Cost in the Voyage Estimate.
    • To recalculate P&L figures in the table, enter a new Daily Cost value.
    • To reset Daily Cost to its default value, clear the field.
  • Wait for Laycan: Select to have idle days added at the first load port in an Estimate if the vessel arrives before the start of laycan. The Waiting Days column shows early/late days when this check box is selected.
  • Clear: Clears all the lines in the form.
  • Generate From Vessel Speeds:Populates all the possible combinations of speeds that are specified on the Vessel form.
  • To sort by a column, click its heading; data is sorted in descending order. To change the sort order, click the heading again.