Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Home > Data Center > Tow

...

Info

Requires the Barging module. You must have the Tow /wiki/spaces/imosv710/pages/64336462 selected, under Vessels in the Data Center.

To create a Tow, on the Vessel List, click + and then click New Tow.

Image RemovedImage Added

  • Insert excerpt
    VIP IMOS - Details View - Card PanelsVIP
    IMOS - Details View - Card Panels
    nopaneltrue
  • Specify at least a Tow CodeType Code, and Tow Name. Complete any other relevant fields.
  • Alerts: This field can be used to capture issues; the Vessel field appears light red on several forms after an Alert is entered for it. An Alerts column can be selected to appear in the Vessel List.Active for Veslink: Select this check box if you want the vessel to be available in Voyage Reporting for form sharing.

Insert excerpt
IMOS - Properties - Vessel
IMOS - Properties - Vessel
nopaneltrue

  • Unit TowWhen this check box is selected, the delivery port and actual dates on an Equipment Contract will automatically update from the voyage.

Insert excerpt
VIP IMOS - VesselVIP
IMOS - Vessel
nopaneltrue

Voyage Overlap Cost Allocation

Voyage Cost Allocation is applicable when a Tow is participating in overlapping voyages.

To access the Tow from the voyage and allocate overlap costs, click Overlap on the Voyage Manager toolbar.

  • All voyages that overlap with the current one appear in the Voyage Overlap Cost Allocation grid.
  • In this grid, you can specify the percentage allocation of costs (hire and bunkers) between two overlapping voyages. 
  • The percentages entered here are reflected in the P&L calculation. The default cost percentage is 50%.