Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Insert excerptVeson IMOS Platform DocumentationVeson IMOS Platform DocumentationnopaneltrueNote: Home > Data Center > Tow

...

Info

Requires the Barging module. You must have the Tow /wiki/spaces/imosv710/pages/64336462 selected, under Vessels in the Data Center.

To create a Tow, on the Vessel List, click + and then click New Tow.

Image RemovedImage Added

  • Insert excerpt
    VIP IMOS - Details View - Card PanelsVIP
    IMOS - Details View - Card Panels
    nopaneltrue
  • Specify at least a Tow CodeType Code, and Tow Name. Complete any other relevant fields.
  • Alerts: This field can be used to capture issues; the Vessel field is highlighted in appears light red on several forms after an Alert is entered for it. An Alerts column can be selected to appear in the Vessel List.

Insert excerpt
IMOS - Properties - Vessel
IMOS - Properties - Vessel
nopaneltrue

  • Unit Tow Check BoxWhen this check box is selected, the delivery port and actual dates on an Equipment Contract will automatically update from the voyage.

Insert excerpt
VIP IMOS - VesselVIP
IMOS - Vessel
nopaneltrue

Voyage Overlap Cost Allocation

Voyage Cost Allocation is applicable when a Tow is participating in overlapping voyages.

To access the Tow from the voyage and allocate overlap costs, click Overlap on the Voyage Manager toolbar.

  • All voyages that overlap with the current one appear in the Voyage Overlap Cost Allocation grid.
  • In this grid, you can specify the percentage allocation of costs (hire and bunkers) between two overlapping voyages. 
  • The percentages entered here are reflected in the P&L calculation. The default cost percentage is 50%.