Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Note: Configuration When demurrage period allocation is enabled (with configuration flag CFGLaytimeEnablePeriodAllocation must be enabled.When ), after Laytime Calculation is  has been saved, you can click  to view demurrage period allocation Period Allocation details.

Allocated Days and % are Demurrage period allocation is based on the Net Apply Demurrage to Period P&L calculation option and Net Demurrage Days (Gross Less Deductions).

...

Expand
titleRelated Config Flags

Section
bordertrue
Column
width30%

CFGLaytimeEnablePeriodAllocation

Column
width70%

Enables demurrage period allocation. 

Section
bordertrue
Column
width30%

CFGDefaultPnlCalcApplyDemurrage

Column
width70%

Note: CFGLaytimeEnablePeriodAllocation must also be enabled.

There are three possible values:

  • PRORATE: Demurrage is prorated based on voyage proration logic: Voyage Days in Period / Total Voyage Days. The Apply The Apply Demurrage to Period check box is cleared by default; if the check box is selected, the calculation logic for BYDAYS is applied.
  • FULL: The Apply Demurrage to Period check box is selected by default, and 100% of a demurrage amount is applied to the P&L reporting period.

  • BYDAYS: The Apply Demurrage to Period check box is selected by default, the amount of demurrage in the P&L reporting period is prorated. The prorata portion is calculated by the following logic: For each port call, Prorated Demurrage Amount = (Number of Days at Port within Period / Total Number of Days in Port in Voyage) × Demurrage Amount.

Section
bordertrue
Column
width30%

CFGDefaultPnlCalcAdjustForDemurrageDays

Column
width70%

Note: CFGLaytimeEnablePeriodAllocation must also be enabled.

When enabled, adjusts the portion percentage for other P&L items based on the demurrage days in the period.