Note: Configuration When demurrage period allocation is enabled (with configuration flag CFGLaytimeEnablePeriodAllocation must be enabled.When ), after a Laytime Calculation is has been saved, you can click to view demurrage period allocation Period Allocation details.
Allocated Days and % are Demurrage period allocation is based on the Net Apply Demurrage to Period P&L calculation option and Net Demurrage Days (Gross Less Deductions).
...
Expand |
---|
title | Related Config Flags |
---|
|
Section |
---|
| Column |
---|
| CFGLaytimeEnablePeriodAllocation |
Column |
---|
| Enables demurrage period allocation. |
|
Section |
---|
| Column |
---|
| CFGDefaultPnlCalcApplyDemurrage |
Column |
---|
| Note: CFGLaytimeEnablePeriodAllocation must also be enabled. There are three possible values: - PRORATE: Demurrage is prorated based on voyage proration logic: Voyage Days in Period / Total Voyage Days. The Apply The Apply Demurrage to Period check box is cleared by default; if the check box is selected, the calculation logic for BYDAYS is applied.
FULL: The Apply Demurrage to Period check box is selected by default, and 100% of a demurrage amount is applied to the P&L reporting period. BYDAYS: The Apply Demurrage to Period check box is selected by default, the amount of demurrage in the P&L reporting period is prorated. The prorata portion is calculated by the following logic: For each port call, Prorated Demurrage Amount = (Number of Days at Port within Period / Total Number of Days in Port in Voyage) × Demurrage Amount.
|
|
Section |
---|
| Column |
---|
| CFGDefaultPnlCalcAdjustForDemurrageDays |
Column |
---|
| Note: CFGLaytimeEnablePeriodAllocation must also be enabled. When enabled, adjusts the portion percentage for other P&L items based on the demurrage days in the period. |
|
|