Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Insert excerpt
Veslink Veson IMOS Platform DocumentationVeslink
Veson IMOS Platform Documentation
nopaneltrue

...

Expand
titleRelated Configuration Flags


Name/FlagDescription
Multi Currency Port Expenses
CFGMultiCurrencyPortExpenses

Enables support for multicurrency estimated port expenses.

Ignore Estimate Pexp on Voyage Charter in
CFGIgnoreEstPexpOnVoyageCharterIn

When a Cargo with a linked VC In is imported to an Estimate/Voyage Fixture/voyage (the relet contract is fixed), the estimated port expenses defined on the cargo are not cleared, and any estimated port expenses defined in the Estimate/voyage Itinerary of a RELT or SPOT voyage are not included in the P&L.

Enable Standards
CFGEnableStandards

Hides the Port Expense field on some forms, enables standards for expenses, and adds a Port Expenses Details form and a Port Expenses Details button on the Port Expenses Summary to open it. When detail-level port expenses are being used, the PortExp column in the Voyage Itinerary behaves the same as the PortExp column in the Estimate itinerary:

  • For a port with no detail-level port expenses, you can edit its PortExp amount in the Voyage Itinerary Cargo Tab. The voyage P&L shows this amount as estimated expenses for that port.
  • For a port with a single detail-level expense, that amount appears and can be edited in the voyage itinerary PortExp field. An estimated expense entered before creating the detail-level expense is no longer displayed in the voyage P&L.
  • For a port with multiple detail-level expenses, the itinerary PortExp field shows the sum of the detail-level expenses for that port and cannot be edited.
  • When CFGVoyageExpenseAllocation is set to Y, a Voyage Expense Allocation section will be added to the Voyage Estimate Profit & Loss Report, and optionally to the Voyage Profit & Loss Report.

An ECA Factor field also appears on COA, Cargo/VC In, and CP Terms Details forms. When ECAFactor is used in an IMOS ECA Recovery Charge Results/Fee expression and an ECA Factor value is entered on a contract, an ECA Recovery Charge Extra Freight Term is generated on that contract.

  • When a COA is created from an Estimate, ECA Factor is copied from CP Terms to the COA.
  • When a COA Lifting is created, ECA Factor is copied from the COA to the Cargo.
  • When a cargo is scheduled, ECA Factor is copied from the cargo to the backcreated Estimate.



Page Properties
hiddentrue


Author
Latest ContributorMichael Bracey
Latest ReviewerLaura Burns